OpsMath™
Operations research, packaged. Optimal schedules, plans, and routes — solved in minutes, not in spreadsheets.
OpsMath turns planning problems that today take a team and a week of spreadsheet wrangling into solver runs that finish before the morning meeting. Production schedules, turnaround sequencing, maintenance backlog, logistics routing, and crew assignment — each modeled as a proper optimization problem with your real constraints, your real costs, and your real preferences.
Who it is for
- Production schedulers balancing throughput, changeovers, and delivery commitments
- Turnaround managers sequencing thousands of jobs across critical-path windows
- Maintenance planners deciding which of 4,000 backlog items to schedule next week
- Logistics and dispatch teams routing trucks, rail cars, or service crews
The problem we are solving
Excel-based planners give you a plan that is feasible but rarely optimal — and rebuilding it when reality changes takes a day. Generic APS tools are heavy, expensive, and force your operation into their data model. Both leave 5–15% margin on the table every week.
How it works
Model your problem, not a template
Our operations research team formulates your specific planning problem — production line, turnaround, backlog, route — as a mixed-integer or constraint program. Your changeover matrix, crew skills, contractor availability, and physical constraints all enter the model.
Solve fast with commercial solvers
OpsMath runs on Gurobi, CPLEX, or OR-Tools depending on problem class. Most production-week schedules solve in under 4 minutes; turnaround sequencing of 8,000 jobs solves overnight. Planners get a configurable UI, not a black box.
Re-plan when reality changes
Late shipment, broken pump, sick crew — re-run with new constraints and get a revised plan in minutes, with a clear diff showing what changed and why.
Measurable benefits
Ranges below reflect the low and high end of outcomes observed across pilots and production deployments. Your numbers will depend on your starting baseline.
Capabilities
- Production scheduling with changeover, crew, and material constraints
- Turnaround / shutdown sequencing with critical path and resource leveling
- Maintenance backlog scheduling against window, craft, and parts availability
- Vehicle and crew routing with time windows and capacity
- Spare-parts inventory optimization with lead-time and criticality
- Scenario comparison: 'what if we add a second crane?' answered in minutes
Integrates with
We connect to the systems you already run. No rip-and-replace.
Proof point
Frequently asked
The questions buyers in your seat actually ask before committing to OpsMath.
Our planners trust their Excel model. How do we avoid a 'black-box' reaction?
How is this different from an APS like SAP APO or Aspen Plant Scheduler?
What size of problem can it actually solve in time for our morning meeting?
What happens when reality changes mid-week — a breakdown, a late shipment, a sick crew?
Do we need an operations research PhD on staff to use it?
Get the plan that leaves nothing on the table.
Send us one planning problem. We will return a working model and a benchmarked solution against your last 8 weeks of actuals within 30 days.
Contact us →